1. THE LIST OF THE MOST IMPORTANT INVESTORS AND PROJECTS in the field of construction, reconstruction and installation works: |
 |
TM IMMO d.o.o, Belgrade (2005.) – Arrange carry out works – works on disruption of existing building and construction works as a part of the construction of BELGRADE OFFICE PARK, total area 15.900 m2, in the Omladinskih brigada St. No.21, New Belgrade; |
 |
ZMEX D.O.O, Belgrade (2005 - work in progress) – Carrying out adaptation works at the PGP RTS business building in Košutnjak, Kneza Višeslava St. No. 86, as part of preparing conditions for DVD and DVD-R production place; |
 |
IMEL-GROUP, Belgrade (2005 - work in progress) – BUSINESS COMPLEX 18/4 – Carrying out construction work as part of the construction of Business complex 18/4 in block 21, New Belgrade; |
 |
METEOR SN BIRO, Belgrade (2005 - work in progress) - Carrying out construction work as a part of the construction of business complex "METEOR" in block 40, complex "G", New Belgrade; |
 |
IMEL-GROUP, Belgrade (2005 - work in progress) – Setting up air conditioning, central heating, electrical installation, plumbing and sewage installation as a part of the construction of "MERKUR" shopping mall, in block 51, New Belgrade; |
 |
DELTA MAXI D.O.O, (2005 – work in progress) – Carrying out construction, installation works as a part of the construction of "PANČEVO CENTAR" in Pančevo; |
 |
IMEL-GROUP, Belgrade - SOCIETE GENERAL YUGOSLAV BANK (2005 – work in progress) – The company signed a contract for setting up heating installations, electrical installations, plumbing and sewage systems, interior work and installing diesel generators in the bank’s new offices in the Block 21 in Novi Beograd; |
 |
HYPO ALPE-ADRIA CONSULTANTS, Belgrade (2004 – 2005.) – Carrying out construction work and installation work as a part of the construction of the HYPO HILL building in Žarkovo in Belgrade; |
 |
CT COMPUTERS, Belgrade (2004 – work in progress) – setting up thermo-technical and electrical installations in the office building of the Com Trade company in Novi Beograd; |
 |
AUTO ČAČAK, (2004 – work in progress) – THE ŠKODA CAR CENTER - BELGRADE- Design and construction of the entire office building, the car showroom and the service workshop for ŠKODA automobiles, a total area of 7.700 m2, built on a "turn-key" basis in the Blocku 41 in Novi Beograd; |
 |
THE CITY OF BELGRADE, (2004 – work in progress) – Carrying out construction work for the construction of the PUBLIC UNDERGROUND PARKING LOT – phase two, Pionirski Park in Belgrade; |
 |
PEDAGOLOGICAL MUSEUM, (2004 – work in progress) – Annexes I and II of the PEDAGOLOGICAL MUSEUM, Belgrade – carrying out construction work and setting up all installations as a part of repair work on the building; |
 |
HYPO ALPE-ADRIA CONSULTANTS, Belgrade (2003-2004.) - HYPO PLAZA - Design and construction of the entire office building, a total area of 5.000 m2. The building was designed and equipped with the latest installation systems: plumbing, sewage system, electrical and installations, telephone lines and LAN installations, special installations for fire detection, fire alarms, carbon monoxide sensors, TV installations, camera surveillance systems, burglar alarms, heating installations, air-conditioning and ventilation installations, as well as installations for vertical transport with passenger and cargo elevators; |
 |
MUNICIPAL GOVERMENT OF THE CITY OF BELGRADE, (2003 - work in progress) – TERAZIJE THEATRE construction work, HVAC and electrical installations telecommunication and signal installations, hydro-technological installations, fire prevention installations, audio and visual systems and radio and television installations, systems for scene mechanics, elevators, lorry platform within the adaptation, reconstruction and extension of the object with an area of 6000 m2; |
 |
MUNICIPAL GOVERMENT OF THE CITY OF BELGRADE, (2003-2004.) - The "BEOGRADSKA ARENA" sports hall in New Belgrade. Setting up high-voltage and low-voltage electrical installations, carrying out various electrical and mechanical tasks for setting up generator sets and setting up all installations for sanitary water supply, plumbing and sewage, installing the electromotor drive mechanism and interior decoration of office space; |
 |
MUNICIPAL GOVERMENT OF THE CITY OF BELGRADE, (2003.) – setting up electrical installations for the decorative lighting on the New Railway Bridge over the Sava river in Belgrade; |
 |
BLIC PRINT, Belgrade (2003.) - Printing house in New Belgrade. The company made the main architectural and construction project and main projects for all installations and also carried out architectural-construction work, interior work and all installations on a "turn key" basis; |
 |
MUNICIPAL GOVERMENT OF THE CITY OF BELGRADE, (2002.) - The Belgrade Drama Theater - Carrying out construction work, electrical installations, telecommunication and signal installations, hydro-technological and thermo-technical installations as a part of the reconstruction of the Theater building; |
 |
MUNICIPAL GOVERMENT OF THE CITY OF BELGRADE, (2002.) – Sports and Recreation Center "Tašmajdan" - Complete reconstruction of indoor and outdoor pools and all auxiliary buildings in Sports centre, capacity 2000+2500 visitors; |
 |
RTS (RADIO TELEVISION OF SERBIA), Belgrade (2002.) – The company carried out the construction work, set up heating installations and air-conditioning installations, electrical installations and also plumbing and sewage installations in the PEC object at 1 Abadareva Street (studio 11 and the surrounding technical rooms); |
 |
MITROS, Sremska Mitrovica (2001-2002.) - Carrying out installation of machines and setting up wiring in the new industrial boiler room of the MITROS factory; a steam block boiler for both natural gas and mazout. Steam production 2x12000 kg/h; |
 |
SO (DISTRICT COUNCIL) STARI GRAD, Belgrade (2001.) - Reconstruction and adaptation of the building of SO Stari Grad. Carrying out architectural-construction works, interior works and installation works in the entrance-hall, the lobby, the president’s office, the conference room, offices and toilet facilities; |
 |
DELTA INVEST A.D., (2001.) - A business building of DELTA HOLDING, the G building in Block 20 in New Belgrade. Installation of high- and low-voltage wiring in the building of about 16000 m2 in total; |
 |
DELTA M - MAXI department stores, (2000 and 2001.) - Setting up installations for air conditioning, central heating, electrical installation, plumbing and toilet installations in 16 shops in Belgrade. Carrying out construction work and the complete installation work for the adaptation of MAXI department store in the Beograđanka building, in Karaburma and Voždovac; |
TELEKOM SRBIJA A.D. is one of our major Investors, for whom, in the period of the last three years, we have completed many adaptation jobs which included construction and interior work, as well as setting up air-conditioning and central heating installations, wiring, plumbing and toilet installations at the following objects: |
| |
Adaptation of the "TELEHOUS" office space – 3rd floor (2004) carrying out construction work and installing thermo-technological and electrical installations; |
| |
The telecommunication center of Mobilna telefonija in Železnik. (2003) –design and carrying out construction work, fittings and installation work.; |
| |
Business premises at 5 Cara Dušana Street (2002.) – stretching over an area of 1.500 m2 ; |
| |
Sales and Show Room of the Mobile Telephony Department (1999), Makedonska Street No.2 , Belgrade, for an area of 200 m2; |
| |
Business offices, Computer and Control Center of ATC Mobile Telephony in Železnik, (1998), for an area of 500 m2; |
| |
The computer center of the IT Head Office, business premises, Novi Beograd, 16a Bulevar Umetnosti Street (2001); |
| |
TK Center, 988 Information Service, Belgrade, Katićeva Street No.16-18 (2000-2001) Making the main architectural and construction plan and all other plans for installations. Setting up thermo-technical installations as a part of the adaptation of the third floor of the TK center occupying an area of 860 m2. Interior work and production of interior equipment; |
| |
Business offices of the Mobile Telephony Division, Belgrade, Kolarčeva Street No.1, for an area of 1.200 m2 (1998, 2000). |
In the period from 1998 up to now, PARTNER INŽENJERING has built more than 170 radio base station for TELEKOM SRBIJA A.D. as a part of extension of the public 064 GSM network for mobile telecommunication. |
 |
THE "DOCTOR VOJISLAV ILIĆ" MATERNITY HOSPITAL, Požarevac (1999.) - Carrying out final construction and interior work, which required locksmiths, carpenters and other craftsmen who constructed a ventilating facade and marble floors, as well as setting up all installations (plumbing, toilet installations, central heating installations, air conditioning installations, the system for distribution of medical gases, high- and low- voltage wiring and connecting all installations to the local distributive network) on an area of 9.500 m2; |
 |
McDONALD'S, New Belgrade (1998.) - In the administration building and the "Time out" restaurant the company set up air-conditioning installations, thermo-technical installations, wiring, plumbing and toilet installations for an area measuring 2.000 m2; |
 |
ICN - Galenika, Zemun (1998.) - Setting up installations for the refrigeration plant and for the compressed air plant (preparation and distribution of compressed air) in the factory for production of cephalosporine based drugs; |
 |
VF-TEL-SIEMENS - Zemun, Belgrade (1997.) - Complete reconstruction of the factory with a total area of 6.500 m2, which included construction work, interior work and setting up all installations. The air-conditioning of the building was realized through the application of the most up-to-date automatic regulation system that runs on a central computer; |
 |
RTS (RADIO TELEVISION OF SERBIA), Belgrade (1997.) - Air conditioning of office space with a total area of 6.000 m2; |
 |
JAT and TELEKOM, New Belgrade (1994-1996.) - Air conditioning of a 13.000 m2 large business building. In 1997, the company set up installations, carried out construction work, interior work and performed various other tasks for which its craftsmen were required - on the fifth floor measuring 1.300 m2; |
 |
FACULTY OF ECONOMICS, (1994.) - Disassembling of the existing boiler room and steam heating installation, and setting up of warm-water heating and air conditioning installations for an area of 13.000 m2, construction of a new distant heating room; |
 |
FMP TRADE, Belgrade (1994.) - Air conditioning of a sports hall in Železnik and of the adjacent offices, shops and utility rooms with a total area of 4500 m2; |
 |
FACULTY OF FORESTRY, Belgrade (1994.) - Designing and setting up air conditioning and central heating installations, wiring, plumbing and toilet installations for an area of 4500 m2; |
 |
THE "TAŠMAJDAN" SPORTS AND RECREATION CENTER, Belgrade (1991-1992.) - Construction work, interior work and setting up all installations as a part of the adaptation of the "Taš" Hotel; |
 |
POSTAL SAVING BANK (Post bank), the E annex, Belgrade (1991.) - Setting up air conditioning and central heating, wiring, plumbing and toilet installations for an area of 2500 m2; |
 |
"PLANUM" (1991.) - A housing estate for workers in Železnik and Pale. Boiler rooms, an external distribution point for heating installations and central heating for an area of 3000 m2; |
 |
HOTEL METROPOL, Belgrade (1990.) - Reconstruction and maintenance of installations and the boiler room; |
 |
"OBUĆA", Leštani (1990.) - Boiler room and external heating installations. |
|
2. THE LIST OF THE MOST IMPORTANT INVESTORS AND PROJECTS in the field of gas and thermal engineering: |
So far PARTNER INŽENJERING has constructed more than 300 kilometers of gas pipelines made of steel and polyethylene pipes. In its production facilities, the company has also produced more than 50 metering-regulating gas stations, over 1500 household gas meters, about 300 packaged heating substations etc. In the filed of gas engineering, the most important jobs are: |
 |
JP ZA UPRAVLJANJE GRAĐEVINSKIM ZEMLJIŠTEM ŠABAC , (2004) (THE AGENCY FOR REGULATING DEVELOPMENT AREAS IN THE MUNICIPALITY OF ŠABAC)– carrying out construction work for the main distributive gas network with household connections in Šabac, the total length is 7000 meters; |
 |
„YUGOROSGAZ“ A.D, Belgrade (2001.) Construction of the city pipeline, the total length 13 300 meters, D=273, and setting up cathode protection installations – the first phase, sections one and three, of the project of constructing the main distributive gas network in the city of Niš; |
In the last twelve months, PARTNER INŽENJERING signed several contracts with and also carried out a number of jobs for NIS ENERGOGAS from Belgrade, which is one of the company’s biggest investors: |
| |
construction of a metering and regulating station “Miljkovac” with odorization, the capacity is 650 Nm3/h; |
| |
carrying out machine work as a part of work on rehabilitation of the damaged DN400 gas pipeline at the production plant of “US Steel Serbia" in Smederevo; |
| |
carrying out machine work, construction work and setting up wiring as a part of the construction of the GM05-1 section of the city gas pipeline from the “Bežanijska kosa” Hospital to the “Kalvarija” metering and regulating station, D=273, the total length is 2000 meters; |
| |
carrying out machine and installation work as well as construction work for the construction of the distributive gas network and household connections in the area the “Kalvarija” district of the Municipality of Zemun, the total length is 6000 meters; carrying out machine work for the installation of the “Kalvarija” metering and regulating station; |
| |
carrying out construction work for installation of gas network in the “Banka biljnih gena” Complex (the Bank of Plant Genes); construction and installation of the “Banka biljnih gena” metering and regulating station with a capacity of 250 Nm3/h; |
| |
KOLUBARA INŽENJERING (2004) – carrying out machine work, installation work and construction work for a section of the city gas distibutive pipeline from the metering and regulating station “Kovač” to the metering station “Zvezda” in Belgrade, D= 355, the total length is 1200 meters; |
| |
carrying out machine work and installation work for the construction of the main distributive pipeline of polyethylene pipes in Velika Plana, D= 180, total length 900 meters; carrying out various installation tasks for setting up the “Klanica” metering and regulating station; |
| |
carrying out construction work on a add-on pipeline for the “Ilićevo” metering and regulation station and the “Vinogradi” metering and regulating station in Kragujevac, D= 159, total length 700 meters; |
| |
carrying out machine work and installation work for the construction of the 2000 meter long, main distributive network and setting up household connections in Dedinje, the Savski Venac municipality, Belgrade. |
During 2003 and 2004 J.P. “DIREKCIJA ZA IZGRADNJU OPŠTINE SOPOT“ (The Construction Office of the Municipality of Sopot) entrusted PARTNER INŽENJERING with carrying out a series of jobs related to the installation of the gas network on the territory of the Sopot municipality: |
| |
extension of the gas distributive network in Sopot in the total length of 2500 meters and installation of household gas connections; |
| |
construction of a 8025 meter distributive gas network and construction and installation of the metering and regulating station Ralja, the total capacity is 800 Nm3/h, pin= 5-12 bar, pout= 2-4 bar in Ralja; |
| |
construction of a 5400 meter distributive gas network and construction and installation of the metering and regulating station Rogač, the total capacity is 650 Nm3/h, pin= 5-12 bar, pout= 2-4 bar in Rogač; |
| |
carrying out machine work necessary for the construction of a 3400 meter polyethylene distributive gas network with household connections; |
| |
design, construction and installation of the MRS “Nemenikuće” with a capacity of 650 Nm3/h in Nemenikuće; |
| |
design, construction and installation of the MRS “Popović” with a capacity of 650 Nm3/h in Mali Popović. |
 |
TOPLANA ŠABAC , (2003) – constructing the "BENSKA BARA" heating plant for heating the town of Šabac, the total capacity of the plant is 25MW; |
 |
YUGOROSGAZ, (2003) Constructing a 7800 meter, urban gas pipeline and setting up the installations of the cathode protection – the 1st phase of constructing the gas distribution network in Niš; |
 |
DIREKCIJA ZA IZGRADNJU SO SOPOT (THE AGENCY FOR CONSTRUCTION WORK IN THE MUNICIPALITY OF SOPOT), (2003) Drawing up plans for a 450 kW gas boiler plant and carrying out construction work and mechanical work as well as setting up wiring; delivery of measuring-regulating sets and setting up the installations of the cathode protection on the GM 07-04 gas pipeline in Sopot; |
 |
JKP (public municipal services company) BEOGADSKE ELEKTRANE , (2002-2003) The company produced 300 primary, heat-transfer, container, substations of up to 500 kW as a part of the project of installing central heating in 21000 apartments in Belgrade; |
 |
DIREKCIJA ZA GRADJEVINSKO ZEMLJIŠTE BEOGRADA (THE AGENCY FOR BUILDABLE LAND), (2002-2003) The “Makiš” water processing plant – Reconstruction of the breech room and the filtering plant; replacement of pneumatically powered butterfly nuts equipped with electro-pneumatic positioning devices (a total of 60 breeches ranging from DN 250 to DN 700); |
 |
JKP (public municipal services company) BEOGRADSKI VODOVOD I KANALIZACIJA , (2002) The “Makiš” water processing plant. Reconstruction of a 2500 meter long, medium-pressure, steel, gas pipeline; |
 |
JKP (public municipal services company) TOPLANA ŠABAC, (2002) Constructing a 1000 meter long, medium-pressure urban gas pipeline and delivering and setting up a container-housed measuring-regulating station with the capacity of 1600 Nm3/h; |
 |
JP (public limited company) SREM GAS , (2002) Carrying out complete construction work and setting up wiring as a part of the construction of a MRS and a 900 kW gas boiler plant in Sremska Mitrovica; |
 |
DIREKCIJA ZA IZGRADNJU GRADA KRALJEVA (THE AGENCY FOR CONSTRUCTION WORK IN THE CITY OF KRALJEVO), (2002) Setting up a 2600 meter long, medium-pressure urban gas pipeline and a part of the 1300 meter long, polyethylene distributive network; |
 |
YUGOROSGAZ , (2002) Carrying out mechanical work, construction work and setting up wiring during the construction of an 18 000 Nm3/hMRS for supplying the Krivi Vir heating plant in Niš; |
 |
JP (public limited company) SREM GAS, (2002) At the territory of the Sremska Mitrovica municipality, a 1650 meter, medium-pressure urban gas pipeline was built; |
 |
A measuring and regulating station with a capacity of 260 Nm3/h, pin=6-12 bar, pout=100 mbar, a connection to the MG 05-04 gas pipeline and the indoor distribution of natural gas in the PARTNER INŽENJERING’s production complex at Mirijevski Boulevard No.3 (1999); |
 |
YUGOROSGAZ, (2001) – The construction of the 1st phase of a 9,000 meter long gas pipeline (? 377) as a part of the installation of gas network in Niš; |
 |
LUKA BEOGRAD (BELGRADE PORT), (2001) A 1000 meter long distributive gas pipeline running form the “MRS Luka” to the consumer companies: “Luka Beograd”, “Florida Bel”, “Nelt” and “Idea”; |
 |
NIS ENERGOGAS, Belgrade, LUKA BEOGRAD (The Port of Belgrade), (2000) A plug-in pipeline and LUKA 1 measuring and regulating station with the capacity of 400 Nm3/h, pin= 6-12 bar, pout= 100 mbar; |
 |
JP (PLC) GAS RUMA, (2000) A 1,800 meter long distributive steel gas pipeline (D= 168,3) in Irig; |
 |
MIN GAS, Niš (2000) Works on the main pipeline MG09 – Ražanj to Niš section, D= 530; |
 |
YUGOROSGAZ, (2000) A block station Aleksinac DN500 ANSI 400, a block station Draževac DN500 ANSI 400 and the main distributive node Niš DN 700/500 – all as a part of MG09 gas pipeline; |
 |
NIS ENERGOGAS, Belgrade – X MZ (neighborhood association) Karaburma (1999). A 1600 meter long distributive polyethylene network and internal gas installations in a residential and business building in Salvadora Aljendea Street No.11. A 400 meter long distributive polyethylene network and internal gas installations in ENERGOGAS’s head office and a 2800 meter long distributive polyethylene network Beograd-Surčin-“Centroproizvod”; |
 |
JP (PLC) PLANA, Velika Plana (1999) A 1869 meter long city gas pipeline (D= 273); |
 |
JP (PLC) GAS RUMA , (1999) The design, construction and assembly of a measuring and regulating station with the capacity of 1.225 Nm3/h, pul= 5-12 bar, piz= 2 bar in MZ (neighbourhood association) Hrtkovci, the Municipality of Ruma; |
 |
YUGOROSGAZ, (1999-2000) The construction and assembly of 16 measuring and regulating stations as a part of city gas network in Niš. The capacity is 2.000-20.000 Nm3/h; |
 |
JP (PLC) GAS RUMA, (1999) A 4,690 meter long distributive gas pipeline (D= 88,9) Nikinci – Hrtkovci, and a 6,000 meter long distributive gas pipeline (D= 76,1) Nikinci – Buđanovci; |
 |
YUGOROSGAZ, (1998) The assembly of a transfer station in Pojate and of main measuring and regulating gas station in Ražanj, Aleksinac and Niš; |
 |
JP (PLC) SREM GAS, (1998 and 2000) In the territory of Sremska Mitrovica municipality a 10,650 meter long distributive steel gas pipeline was constructed; |
 |
JP (PLC) GAS RUMA, Stejanovci (1998) A 7,110 meter long distributive gas pipeline (D= 76,1) and a 500 meter long distributive steel gas pipeline (D= 76,1) and a 15,500 meters long distributive polyethylene network for connection of 700 households in Nikinci; |
 |
JP (PLC) GAS RUMA, Žarkovac (1997) “Nova budućnost” (“A New Future”). Conversion of a 500 kW boiler room from solid fuel to gas fuel consumption; |
 |
JP (public limited company) GAS RUMA, (1997) A 7,122 meters long medium-pressure steel gas pipeline (D= 168.3) was construction, Putnici – Žarkovac – Irig (The Municipality of Ruma). The company also constructed a 5,556 meter long distributive gas network in Žarkovac and a 7,500 meter long distributive gas network in Dobrinovci; |
 |
NIS ENERGOGAS, (1996) In the housing estate Cerak in Belgrade a 100 meter long steel supply-gas-pipeline (D= 168,3), a measuring and regulating station with the capacity of 2x3000 Nm3/hand a 2600 meter long distributive gas network with 120 connected households were constructed. Works on the expansion of the gas network are in progress in IV MZ (a neighborhood association) SO (a district council) Čukarica, housing estate Cerak, until the planned length of 15,550 meters is reached, which would make it possible to connect 2500 households to the network; |
 |
JP (public limited company) GAS RUMA, Voganj (1996) A 1,770 meter long medium-pressure gas pipeline (D= 76,1) was constructed as well as a 6,000 meter long distributive gas network to which 400 households can be connected; |
 |
During 1996 – Design and construction of internal gas installations, conversion and reconstruction of industrial boiler rooms in Jagodina, Banatsko Novo Selo, Donji Petrovci and Aranđelovac; |
 |
JP (public limited company) GAS RUMA, (1995) A 15,000 meter long street gas pipeline made of polyethylene pipes was constructed in Ruma and about 300 house connections in residential houses and blocks of flats were installed. The company also construced a 5,000 meter long street gas pipeline and installed 250 house connections in DONJI PETROVCI; |
 |
NIS ENERGOGAS, Belgrade (1992-1996) Design and construction of internal gas installation in MZ (a neighborhood association) Petlovo Brdo. So far, about 1000 projects have been made and about 500 internal gas installations have been constructed and connected to the network; |
 |
THE LOCAL COMMUNITY OF BANATSKO NOVO SELO, (1992-1994), setting up gas installations in Banatsko Novo Selo. Construction of a 3000 meter long supply-gas-pipeline, the main measuring and regulating station, a 70,000 meter long distributive network made of polyethylene pipes for estimated 2300 house connections. Design and construction of internal gas installations. |
|
3. Using its own resources, PARTNER INŽENJERING built: |
 |
Block of flats in Mosorska Street in Belgrade, with a usable area of 1100 m2. The building has a basement, where the parking space is located, and seven flats on four floors; |
 |
Semidetached residential building in Mitropolita Pavla Nenadovića Street in Belgrade. The building has six flats with a total area of 1200 m2. |
|
The company made the main architectural and construction project and main projects for all installations for the buildings and also built them on a "turn-key" basis. |
|
|